Skip to Local Navigation
Skip to Content
California State University, Long BeachCalifornia State University, Long Beach

Employee Notification Letter

Presence of Asbestos in CSULB Buildings

January 2012

SECTION 25915 of the California Health and Safety Code requires that a written notification be provided to employees informing them of the presence of asbestos in buildings. In order to comply with this regulation, this letter notifies you that an asbestos survey has been completed in several campus buildings and the known asbestos containing building materials (ACBM) are listed in the table below.

The presence of asbestos in a building does not mean that the health of building occupants is endangered. If ACBM remains in good condition and is not disturbed, the likelihood of exposure is negligible. However, when ACBM is damaged or disturbed without proper controls, asbestos fibers are released into the air creating a potential exposure hazard.

Thus, it is important for employees to follow proper work practices to minimize the potential for disturbing ACBM. No work involving disturbance of physical components of any University owned or occupied building may be started without a complete written Facility Survey. Consult the University Asbestos Management Plan for specific project requirements. If you find ACBM that has been damaged, report it to Facilities Management at extension 54357 or the Office of Environmental Health and Safety at extension 52283. Do not disturb damaged asbestos containing material, damaged asbestos material or asbestos debris. Only persons authorized and properly trained should perform any work which may disturb asbestos materials. Any renovations or demolitions required by any project on campus (department based, self-help, Facilities Management directed, Physical Planning and Construction Management directed, minor or major capital projects) must be proceeded by a complete facility survey of all construction materials, completed by a Certified Asbestos Consultant (CAC). The report generated by the CAC will become a permanent component of the project record, and must be maintained by the University for a period of 30 years.

Any employee may review the asbestos survey reports, results of bulk sampling, or air monitoring conducted in campus buildings. All asbestos data will be available between the hours of 8:00 a.m. and 5:00 p.m. Monday through Friday at Facilities Management Customer Service by appointment with David Beadle. This document in its entire form is available for review on the following website partition:
http://www.ppfm.csulb.edu

Asbestos containing building materials known to be in campus buildings are identified on the attached list. If you have any questions, please contact George Alfaro, Environmental Compliance Manager, Environmental Health and Safety, at extension 52378 or David Beadle, Director, Environmental Health and Safety, at extension 58893.

Building Number Building Name Location Building Material
1 Brotman Hall Rooms 343 and 398 Chilled water lines insulation packing
1 Brotman Hall Rooms 343 and 398 Original floor tile and mastic, cove base mastic
2 Student Health Rooms 117 and 119 Emergency generator exhaust pipe insulation
2 Student Health Mechanical Room 120 Sprayed fireproofing on beams
4 Soroptimist House Ceiling Acoustical ceiling
4 Soroptimist House Roof Roof Penetration Mastic
4 Soroptimist House Entire Building Black Mastic beneath sheet vinyl flooring
5 Family and Consumer Science Entire Building Exterior window glazing
5 Family and Consumer Science Entire Building Carpet and floor tile mastic
6 University Student Union Mechanical Rooms Heating pipe insulation
6 University Student Union Mechanical Rooms Original fireproofing on beams and joists
6 University Student Union Entire Building Fittings on heating lines
6 University Student Union Auditorium Mezzanine Platform below projection booth Fireproofing
7 Cafeteria Boiler Rooms Hot water tank insulation
7 Cafeteria Entire Building Pipe insulation
7 Cafeteria Roof Fan Unit
9 Psychology Entire Building Domestic hot water pipe insulation
9 Psychology Entire Building Floor tile
9 Psychology Entire Building Floor tile mastic
9 Psychology Entire Building Cove base mastic
9 Psychology Entire Building Ceiling tile mastic
10 Liberal Arts 5 Entire Building Heating hot water pipe insulation
10 Liberal Arts 5 Entire Building Ceiling tile mastic
10 Liberal Arts 5 Entire Building Floor tile mastic
10 Liberal Arts 5 Entire Building Window caulking/putty
10 Liberal Arts 5 Entire Building Interior of original chalkboards
11 Liberal Arts 4 Entire Building Heating hot water pipe insulation
11 Liberal Arts 4 Entire Building Floor tile and mastic
11 Liberal Arts 4 Entire Building Cove base mastic
11 Liberal Arts 4 Entire Building Window caulking / putty
12 Liberal Arts 3 Entire Building - except Room 5 Pipe insulation
12 Liberal Arts 3 Entire Building Floor tile and mastic
12 Liberal Arts 3 Entire Building Window caulking / putty
13 Liberal Arts 2 Entire Building Heating hot water pipe insulation
13 Liberal Arts 2 Entire Building Floor tile and mastic
13 Liberal Arts 2 Entire Building Window caulking / putty
14 Liberal Arts 1 Entire Building - except Boiler Room Heating hot water pipe
14 Liberal Arts 1 Entire Building - except Boiler Room Valves
14 Liberal Arts 1 Entire Building - except Boiler Room Mechanical equipment insulation
14 Liberal Arts 1 Penthouse Domestic hot water pipe insulation
14 Liberal Arts 1 Entire Building 9" x 9" floor tiles and mastic
14 Liberal Arts 1 Entire Building Window caulking / putty
15 Faculty Office 3 Entire Building Hot water pipe insulation
15 Faculty Office 3 Entire Building Floor tile and mastic
15 Faculty Office 3 Entire Building Cove base mastic
15 Faculty Office 3 Entire Building Ceiling tile mastic
15 Faculty Office 3 Room 1 Hot water pipe insulation
15 Faculty Office 3 Corridor 4 Hot water pipe insulation
15 Faculty Office 3 Room 7 Heating pipe insulation (fittings only)
16 Faculty Office 2 Entire Building Ceiling tile mastic
16 Faculty Office 2 Entire Building Window caulking / putty
16 Faculty Office 2 Second floor Residue of old mastic on wood deck
17 Lecture Halls 150/151 Room 3 Cove base mastic
17 Lecture Halls 150/151 Room 4 Cove base mastic
17 Lecture Halls 150/151 Entire Building Ceiling tile mastic
18 KKJZ Entire Building and Service Tunnel Heating line insulation
18 KKJZ Entire Building Floor tile and mastic
19 Library Entire Building Original floor tile and mastic
19 Library Entire Building Fittings on heating lines
19 Library Room 105 Joint sealing compound on air handler
20 Academic Services 3rd floor Domestic hot water pipe insulation
20 Academic Services Entire Building 9" x 9" floor tile and mastic
20 Academic Services Entire Building Window caulking / putty
21 Multi Media Center Rooms 101 & 201 Transite wall panels
22 Education 1 Entire Building Window caulking / putty
22 Education 1 Entire Building Floor tile and mastic
22 Education 1 Entire Building - except Boiler Room Hot water line insulation
22 Education 1 Roof Green/White pebbled roll-on roofing
23 Education 2 Entire Building Window caulking / putty
23 Education 2 Entire Building Yellow floor tile and mastic
23 Education 2 Entire Building - except Boiler Room Heating line insulation
23 Education 2 Entire Building - except Boiler Room Chilled water line insulation
23 Education 2 Entire Building 9" x 9" floor tile and mastic
23 Education 2 Entire Building Floor tile mastic
24 McIntosh Humanities Office Building Floors 1 - 9 Heating line insulation
24 McIntosh Humanities Office Building Entire Building 9" x 9" floor tile and mastic
24 McIntosh Humanities Office Building Entire Building Cove base mastic
24 McIntosh Humanities Office Building Basement Steam line insulation
25 Language Arts Building Room 325 Chiller line insulation
25 Language Arts Building Room 325 Heating line insulation
25 Language Arts Building Entire Building Floor tile and mastic
25 Language Arts Building Entire Building Cove base mastic
25 Language Arts Building Entire Building Supply duct blown on insulation, gray in color
26 Studio Theatre Mechanical Rooms - except Basement Pipe insulation
26 Studio Theatre Entire Building - except Basement Chilled water line fitting insulation
26 Studio Theatre Entire Building 9" x 9" floor tile and mastic
26 Studio Theatre Entire Building Cove base mastic
26 Studio Theatre Rooms 240A, 240B & Mechanical Room White perforated wall board
27 University Theatre Entire Building Heating line insulation
27 University Theatre Theater Fire curtain
27 University Theatre Lower Level Original floor tile and some mastic in some rooms
27 University Theatre Lower Level Ceiling tile mastic
27 University Theatre 1st and 2nd Levels Floor tile and mastic
27 University Theatre 1st and 2nd Levels Cove base mastic
27 University Theatre 1st and 2nd Levels Ceiling tile mastic
28 University Telecommunications Center Entire Building Heating line insulation
28 University Telecommunications Center Entire Building Floor tile and mastic
28 University Telecommunications Center Entire Building Cove base mastic
28 University Telecommunications Center Entire Building Ceiling tile mastic
28 University Telecommunications Center Entire Building Window caulking / putty
32 Fine Arts 1 Rooms 202, 203 and 204 Floor tile and mastic
34 Fine Arts 3 Entire Building Heating line insulation
34 Fine Arts 3 Entire Building Domestic hot water line insulation
34 Fine Arts 3 Entire Building Steam line insulation
34 Fine Arts 3 Room 105 Floor tile and mastic
34 Fine Arts 3 Room 105 Cove base mastic
34 Fine Arts 3 Room 104G Floor tile and mastic
34 Fine Arts 3 Room 104G Cove base mastic
35 Fine Arts 4 Entire Building - except Boiler Room Heating line insulation
35 Fine Arts 4 Entire Building - except Boiler Room Domestic hot water line insulation
35 Fine Arts 4 Entire Building - except Boiler Room Steam line insulation
35 Fine Arts 4 Entire Building Floor tile and mastic
35 Fine Arts 4 Entire Building Interior of original chalkboards
36 Faculty Office 4 Entire Building Floor tile and mastic
37 Peterson Hall 1 Entire Building Transite panels in fume hoods
37 Peterson Hall 1 Entire Building Transite panels in cove insulation
37 Peterson Hall 1 Entire Building Floor tile and mastic
37 Peterson Hall 1 Entire Building Window caulking / putty
37 Peterson Hall 1 Entire Building Original stone laboratory bench tops
37 Peterson Hall 1 Roof Flex connectors on fume hood exhaust
38 Peterson Hall 2 Entire Building Window caulking / putty
38 Peterson Hall 2 Entire Building Transite panels in fume hoods
38 Peterson Hall 2 Entire Building Transite panel oven insulation
38 Peterson Hall 2 Entire Building Original stone laboratory bench tops
38 Peterson Hall 2 First floor Pipe fitting insulation
38 Peterson Hall 2 Entire Building 9" x 9" floor tile and mastic
38 Peterson Hall 2 Room 215 12" x 12" floor tile and mastic
38 Peterson Hall 2 Elevator Door seal
41 Microbiology Entire Building Floor tile and mastic
45 Faculty Office 5 Entire Building Floor tile and mastic
46 SS/PA Mechanical Rooms Pump and valve insulation
46 SS/PA 100, 200 & 300 Levels Floor tile and mastic
46 SS/PA Entire Building Fire rated door cores
47 Physical Education Entire Building Some pipe insulation in walls and above ceilings
48 Applied Arts & Science Classroom Mech Room 228 Some pipe fittings in walls and above ceilings
49 Applied Arts & Science Offices Entire Building Some pipe fittings in walls and above ceilings
50 Vivian Engineering Center Entire Building Some heating hot water pipe insulations above ceilings / in walls
50 Vivian Engineering Center Entire Building Floor tile / mastic
50 Vivian Engineering Center Room 124 Door gasket on large autoclave
51 Engineering 2 Entire Building Some pipe insulation in walls and above ceilings
52 Engineering 3 Entire Building Some pipe insulation in walls and above ceilings
53 Engineering 4 Entire Building - except Boiler Room Heating pipe insulation
53 Engineering 4 Entire Building Domestic hot water pipe insulation
53 Engineering 4 Exterior Courtyard Exposed 24" transite Pipe
53 Engineering 4 Boiler Lab Turbine steam line insulation
53 Engineering 4 Entire Building 9" x 9" floor tile and mastic
54 Design Room 112 Transite in welding booths
54 Design Entire Building Some pipe insulaition in walls
54 Design Entire Building Window caulking / putty
55 Human Services and Design Entire Building Domestic hot water pipe insulation
55 Human Services and Design Entire Building Window caulking / putty
55 Human Services and Design Entire Building 9" x 9" floor tile and mastic
55 Human Services and Design Entire Building above dropped ceiling Sprayed on fireproofing on beams and joists
56 Engineering Technology Entire Building Interior of fire doors
56 Engineering Technology Entire Building Floor tile and mastic
57 Facilites Management Entire Building Domestic hot water line
58 Corporation Yard Men's room / storage next to Carpenter Shop Heating and domestic hot water pipe insulation
58 Corporation Yard Adjacent to Green House Green House Heating / Steam Unit
58 Corporation Yard Adjacent to Green House Pipe insulation/boiler insulation
59 Child Dev. Center Director's Old Office Rough acoustic ceiling
59 Child Dev. Center Director's Old Office (non-asbestiform tremolite)
60 Los Alamitos Hall Entire Building except Boiler Room Domestic hot water pipe insulation
61 Los Cerritos Hall Entire Building except Boiler Room Domestic hot water pipe insulation
62 Residence Commons Buildings A - F except Boiler Room Domestic hot water pipe insulation
62 Residence Commons Building L Carpet/tile mastic
63 All Residence Housing Entire Facility All underground natural gas
63 All Residence Housing Entire Facility Domestic water lines
63 All Residence Housing Entire Facility Associated buried service pipe
63 RLC – Cafeteria Exterior building walls Exterior stucco
63 RLC – Cafeteria Parking area, may be in enclosed pipe chases Mudded pipe elbows/fitting insulation
63 RLC – Cafeteria Roof, north concrete columns Flashing mastic
63 RLC – Cafeteria Ceilings Joint compound
63 RLC – Las Encinitas Stairwells and areas beneath newer flooring Black mastic
63 RLC – Las Encinitas Roof vent pipes Silver paint
63 RLC – Las Encinitas A/C units Silver paint
63 RLC – Las Encinitas supporting "T" beams Silver paint
63 RLC – Las Encinitas Windows throughout building Window putty
63 RLC – Las Encinitas Second floor corridor 12” x 12” floor tile and mastic
63 RLC – Las Encinitas Ceilings throughout structure (may be under drop-down ceiling panels) Acoustical spray-on ceiling
63 RLC – Las Encinitas Mechanical rooms and ceiling plenums Pipe elbow and fitting insulation
63 RLC – Las Encinitas Roof Roof penetration mastic
63 RLC – Las Encinitas Room 532 Drywall sheetrock, tape and joint compound
63 RLC – Las Encinitas Ceilings Joint compound
63 RLC – Los Robles Storage rooms and beneath newer flooring Black floor mastic
63 RLC – Los Robles Carpeted areas throughout building Tan carpet mastic
63 RLC – Los Robles Windows throughout building Window putty
63 RLC – Los Robles Second floor corridor 12” x 12” floor tile and mastic
63 RLC – Los Robles Ceilings throughout structure (may be under drop-down ceiling panels) Acoustical spray-on ceiling
63 RLC – Los Robles Mechanical rooms and ceiling plenums Pipe elbow and fitting insulation
63 RLC – Los Robles Roof Roof penetration mastic
63 RLC – Los Robles Ceilings Joint compound
71 University Music Center Entire buildings Floor tile / mastic