Skip to Local Navigation
Skip to Content
California State University, Long BeachCalifornia State University, Long Beach

CSULB 2009-10 Budget Results and 2010-11 Preliminary Budget Outlook

Get Acrobat Reader

printable version

CSULB 2009-10 BUDGET RESULTS

CSULB 2009-10 BUDGET
Budget reductions, cost increases Permanent One-Time Total
Campus share of $571.1M $(44,076,600) $(44,076,600)
Campus share of $77.5M $ (5,574,700) (5,574,700)
Mandatory costs increases (2,101,700) (2,101,700)
Campus priorities (2,347,300) (2,347,300)
Total budget reductions, cost increases $(48,525,600) $(5,574,700) $(54,100,300)

Budget Reductions, Cost Increases

For 2009-10, the state reduced the CSU budget by $571.1 million. This consisted of the $50M reduction tied to the federal stimulus funds “trigger”, the $255M Governor’s line-item veto, and the $266.1M Governor’s unallocated reduction. The CSU Chancellor’s Office apportioned $44M of that to the Long Beach campus. In addition, the state levied a one-time $77.5M CSU reduction and Long Beach’s share of that was $5.6M. CSULB has $4.5M in mandatory cost increases associated with health benefits, utilities, the faculty PPI salary program, and new space adjustments. CSULB has identified campus priorities of $1.8M for the comprehensive fundraising campaign and $500 thousand for classroom maintenance. CSULB’s total budget problem was over $54M.