SECTION 25915 of the California Health and Safety Code requires that a written notification be provided to employees informing them of the presence of asbestos in buildings. In order to comply with this regulation, this letter notifies you that an asbestos survey has been completed in several campus buildings and the known asbestos containing building materials (ACBM) are listed in the table below.

The presence of asbestos in a building does not mean that the health of building occupants is endangered. If ACBM remains in good condition and is not disturbed, the likelihood of exposure is negligible. However, when ACBM is damaged or disturbed without proper controls, asbestos fibers are released into the air creating a potential exposure hazard.

Thus, it is important for employees to follow proper work practices to minimize the potential for disturbing ACBM. No work involving disturbance of physical components of any University owned or occupied building may be started without a complete written Facility Survey. Consult the University Asbestos Management Plan for specific project requirements. If you find ACBM that has been damaged, report it to Facilities Management at extension 54357 or the Office of Safety and Risk Management at extension 52283. Do not disturb damaged asbestos containing material, damaged asbestos material or asbestos debris. Only persons authorized and properly trained should perform any work which may disturb asbestos materials. Any renovations or demolitions required by any project on campus (department based, self-help, Facilities Management directed, Physical Planning and Construction Management directed, minor or major capital projects) must be proceeded by a complete facility survey of all construction materials, completed by a Certified Asbestos Consultant (CAC). The report generated by the CAC will become a permanent component of the project record, and must be maintained by the University for a period of 30 years.

Any employee may review the asbestos survey reports, results of bulk sampling, or air monitoring conducted in campus buildings. All asbestos data will be available between the hours of 8:00 a.m. and 5:00 p.m. Monday through Friday at Facilities Management by appointment with Robert Quirk. This document in its entire form is available for review on the following website partition:
http://www.ppfm.csulb.edu

Asbestos containing building materials known to be in campus buildings are identified on the attached list. If you have any questions, please contact George Alfaro, Environmental Compliance Manager, Safety and Risk Management, at extension 52378 or Robert Quirk, Director, Facilities Management, at extension 58886.

Building Number Building Name Location Building Material
1 Student Services Administration Rooms 343 and 398 Chilled water lines insulation
1 Student Services Administration Entire Building Original floor tile and mastic, cove base mastic
2 Student Health Rooms 117 and 119 Emergency generator exhaust pipe insulation
2 Student Health Mechanical Room 120 Sprayed fireproofing on beams
4 Soroptimist House Ceiling Rough ceiling
6 University Student Union Mechanical Rooms Heating pipe insulation
6 University Student Union Entire Building Original fireproofing on beams and joists
Fittings on heating lines
6 University Student Union Auditorium Mezzanine Platform below projection booth Fireproofing
7 Cafeteria Boiler Rooms Hot water tank insulation
7 Cafeteria Entire Building Pipe insulation
7 Cafeteria Roof Fan Unit
9 Psychology Entire Building Domestic hot water pipe insulation
Floor tile
Floor tile mastic
Cove base mastic and c
Ceiling tile mastic
10 Liberal Arts 5 Entire Building Heating hot water pipe insulation
Ceiling tile mastic, floor tile mastic
Window caulking/putty
Interior of original chalkboards
11 Liberal Arts 4 Entire Building Heating hot water pipe insulation
Floor tile and mastic, cove base mastic
Window caulking / putty
12 Liberal Arts 3 Entire Building - except Room 5 Pipe insulation
12 Liberal Arts 3 Entire Building Floor tile and mastic
Window caulking / putty
Heating hot water pipe insulation
Floor tile and mastic
Window caulking / putty
14 Liberal Arts 1 Entire Building - except Boiler Room Heating hot water pipe, valves, and mechanical equipment insulation
14 Liberal Arts 1 Penthouse Domestic hot water pipe insulation
14 Liberal Arts 1 Entire Building 9x9" Floor tiles and mastic
Window caulking / putty
15 Faculty Office 3 Entire Building

Hot water pipe insulation
Floor tile and mastic
Cove base mastic and
Ceiling tile mastic

15 Faculty Office 3 Room 1 Hot water pipe insulation
15 Faculty Office 3 Cooridor Hot water pipe insulation
15 Faculty Office 3 Room 7 Heating pipe insulation (fittings only)
16 Faculty Office 2 Entire Building Ceiling tile mastic
16 Faculty Office 2 Second Floor

Residue of old mastic on wood deck

17 Lecture Halls 150/151 Room 3 Cove base mastic
17 Lecture Halls 150/151 Room 4 Cove base mastic
17 Lecture Halls 150/151 Entire Building Ceiling tile mastic
18 KLON Entire Building and Service Tunnel Heating line insulation
18 KLON Entire Building Floor tile and mastic
Ceiling tile mastic
19 Library West Entire Building Fittings on heating lines
Original floor tile and mastic
19 Library West Room 105 Joint sealing compound on air handler
20 Library East 3rd Floor Domestic hot water pipe insulation
20 Library East Entire Building 9x9" floor tile and mastic
Window caulking / putty
21 Multi Media Center Rooms 101 & 201 Transite wall panels
22 Education 1 Entire Building Floor tile and mastic
Window caulking / putty
22 Education 1 Entire Building - except Boiler Room Hot water line insulation
23 Education 2 Entire Building Window caulking / putty
Yellow floor tile and mastic
23 Education 2 Entire Building - except Boiler Room Heating line insulation
Chilled water line insulation
24 McIntosh Humanities Office Building Floors 1 - 9 Heating line insulation
24 McIntosh Humanities Office Building Entire Building 9x9" floor tile and mastic
Cove base mastic
24 McIntosh Humanities Office Building Basement Steam line insulation
25 Language Arts Building Room 325 Heating line insulation
25 Language Arts Building Room 325 Chiller line insulation
25 Language Arts Building Entire Building Floor tile and mastic
Cove base mastic
Supply duct blown on insulation, gray in color
26 Studio Theatre Mechanical Rooms - except Basement Pipe insulation
26 Studio Theatre Entire Building - except Basement Chilled water line fitting insulation
26 Studio Theatre Entire Building 9x9" floor tile and mastic
Cove base mastic
26 Studio Theatre Rooms 240A, 240B & Mechanical Room White perforated wall board
27 University Theatre Entire Building Heating line insulation
27 University Theatre Theater Fire curtain
27 University Theatre Lower Level Original floor tile and some mastic in some rooms, Ceiling tile mastic
27 University Theatre 1st and 2nd Levels Floor tile and mastic
Cove base mastic
Ceiling tile mastic
28 University Telecommunications Center Entire Building Heating line insulation
Floor tile and mastic
Cove base mastic
Ceiling tile mastic
32 Fine Arts 1 Rooms 202, 203 and 204 Floor tile and mastic
34 Fine Arts 3 Entire Building Heating line insulation
Domestic hot water pipe insulation
34 Fine Arts 3 Room 105 Floor tile and mastic
Cove base mastic
34 Fine Arts 3 Room 104G Floor tile and mastic
Cove base mastic
35 Fine Arts 4 Entire Building - except Boiler Room Heating line insulation
Domestic hot water pipe insulation
Steam line insulation
35 Fine Arts 4 Entire Building Floor tile and mastic
Interior of original chalkboards
36 Faculty Office 4 Entire Building Floor tile and mastic
37 Peterson Hall 1 Roof Flex connectors on fume hood exhaust
37 Peterson Hall 1 Entire Building Transite panels in fume hoods
Transite panels in cove insulation
Floor tile and mastic
Window caulking / putty
Original stone laboratory bench tops
38 Peterson Hall  2 Entire Building Window caulking / putty
Transite panels in fume hoods
Transite panel oven insulation
Original stone laboratory bench tops
38 Peterson Hall  2 1st Floor Pipe fitting insulation
38 Peterson Hall  2 Entire Building 9x9" floor tile and mastic
38 Peterson Hall  2 Room 215 12x12" floor tile and mastic
38 Peterson Hall  2 Elevator Door seal
39-40 Peterson Hall 3 Entire Building

Window caulking / putty
Transite panels in fume hoods
Transite panel oven insulation
Floor tile and mastic
Cove base mastic
Original stone laboratory bench tops

39-40 Peterson Hall 3 Entire Building - except Boiler Room Domestic hot water pipe insulation
41 Microbiology Entire Building Floor tile and mastic
42 Science Animal House Entire Building Floor tile and mastic
43 Science Green House 2 Entire Building Transite panels below windows
Window glazing / putty
45 Faculty Office 5 Entire Building Floor tile and mastic
46 SS/PA Mechanical Rooms Pump and valve insulation
46 SS/PA 100, 200 & 300 Levels Floor tile and mastic
47 Physical Education Entire Building Some pipe insulaition in walls and above ceilings
48 Applied Arts & Science Classroom Mech Room 228 Some pipe fittings in walls and above ceilings
49 Applied Arts & Science Offices Entire Building Some pipe fittings in walls and above ceilings
50 Vivian Engineering Center Entire Building Some heating hot water pipe insulations above ceilings / in walls
50 Vivian Engineering Center Room 124 Door gasket on large autoclave
52 Engineering 2 Entire Building Some pipe insulation in walls and above ceilings
53 Engineering 3 Entire Building Heating and hot water pipe insulation
53 Engineering 4 Entire Building - except Boiler Room Heating pipe insulation
53 Engineering 4 Entire Building Domestic hot water pipe insulation
53 Engineering 4 Boiler Lab Turbine steam line insulation
54 Design Room 112 Transite in welding booths
54 Design Entire Building Some pipe insulaition in walls
Window caulking / putty
55 Technology Ed 2 Entire Building Domestic hot water pipe insulation
Window caulking / putty
9x9" floor tile and mastic
55 Technology Ed 2 Entire Building - above dropped ceiling Sprayed on fireproofing on beams and joists
56 Engineering Technology Entire Building Interior of fire doors
Floor tile and mastic
Domestic hot water line
58 Corporation Yard  Mensroom / storage next to Carpenter Shop

Heating and domestic hot water next to Carpenter Shop
Pipe insulation

58 Corporation Yard  Adjacent to Green House

Green House Heating / Steam Unit
Pipe insulation/boiler insulation

59 Child Dev. Center Director's Old Office

Rough acoustic ceiling
(non-asbestiform tremolite)

60 Los Alamitos Hall Entire Building - except Boiler Room Domestic hot water pipe insulation
61 Los Cerritos Hall Entire Building - except Boiler Room Domestic hot water pipe insulation
62 Residence Commons Buildings A - F except Boiler Room Domestic hot water pipe insulation
62 Residence Commons Building L Carpet/Tile Mastic
62 All Residence Housing Entire Facility All underground natural gas, domestic water lines, and associated buried service pipe